The following link will take you to information regarding an Underground Single Phase Line Extension/New Construction:

Line Extension 200/320 Amp Service

Cost to Member

  • Meter loop/Meter can;

  • URD service wire, 4/0 or 350 service wire available, please see products list for current pricing;

    • Note: Cost is for wire only. Installation is member's responsibility.

Restrictions

  • All service must meet National Electric Code; HOTEC reserves the right to disallow any service not up to NEC or HOTEC specifications;

  • Underground service must be buried a minimum of 24 inches;

  • HOTEC will extend 125 ft. of secondary service from transformer.  If service has not yet made contact with the home’s electrical entrance there will be a meter pedestal set at this point or any point between the transformer and the 125 ft. secondary extension;

  • If a service extends past 125 ft. the customer will be responsible for installing all secondary wire and conduit past the point of the pedestal;

  • Owner or builder will be responsible for any trenching, bedding, or backfill.  All trenching, bedding, and backfill must be approved by HOTEC.

To view the specification sheet for a 200 Amp Meter Loop, click the link below:

HOTEC Spec Sheet: 200 Amp Meter Loop

To view the specification sheet for a 320 Amp Meter Pedestal, click the link below:

HOTEC Spec Sheet: 320 Amp Meter Pedestal

Mobile Home

mobile home

Spec Sheet for Mobile Homes

Are you looking to have work done by Heart of Texas Electric at your mobile home? This is the information you will need to for any and all construction completed by HOTEC based upon our required specifications.

Mobile Home Spec Sheets

Non-Residential Permanent Structure

image coming soon

Spec Sheet for Non-Residential Permanent Structures

For more information on construction for a Overhead Single Phase Line Extension on a Non-Residential Permanent Structure, please follow the link below.


Non-Residential Permanent Structure

Permanent Residence | Site Built Home

image coming soon

Spec Sheet for Permanent Residence

For more information on construction for a Overhead Single Phase Line Extension on a Permanent Structure, please follow the link below.



Permanent Structure

Temporary or Seasonal Structures

image coming soon

Spec Sheet for Temporary or Seasonal Structures

For more information on construction for a Overhead Single Phase Line Extension for Temporary or Seasonal Structures please follow the link below.

Temporary or Seasonal Structures

Underground Single Phase 200 or 320 AMP

320

Spec Sheet for Underground Single Phase 200 or 320 AMP

For more information on construction for an Underground Single Phase 200 or 320 AMP, please follow the link below:

Underground Single Phase 200 or 320 AMP

Important Financial Disclosure

IMPORTANT IMAGE

Important Financial Disclosure

When it comes to doing business, the cooperative may elect to charge for actual work order expense.

ML

 

 

Have questions about your project?
We're here to help!