Underground Single Phase Line Extension/New Construction | Line Extension 200/320 Amp Service

Heart of Texas Electric Cooperative
  • All URD service is member installed
  • Service wire and metering installations may be purchased from other electrical merchants that meet NEC specifications.
  • Prices for construction and wire will be recalculated periodically.
  • HOTEC will collect 100% Aid to Construction for all line to be installed
  • 100% of Line Extension at $22.00/ft (non-refundable Aid to Construction)
  • HOTEC will collect 100% of the cost for the removal of any line.
  • Meter Pedestal/Meter base
  • Meter Current Transformer Package >320 Amps
  • Underground (URD) service installation
  • All service must meet National Electric Code; HOTEC reserves the right to disallow any service not conforming to NEC or HOTEC specifications.
  • Underground service must be buried a minimum of 24”
  • Owner or builder will be responsible for trenching, bedding and backfill of service installation.  All trenching, bedding and backfill must be approved by HOTEC.
  • The cooperative may elect to charge actual work order expense