Member Information

Member Information

Installer Information

Installer Information

System Information

Type of Distributed Generator
One line diagrams will also be accepted through mail or email, but will be required before interconnection agreement is signed and approved.
One file only.
100 MB limit.
Allowed types: txt, rtf, pdf, doc, docx, odt, ppt, pptx, odp, xls, xlsx, ods.
The following information will be used to help properly design the Cooperative’s interconnection for the DG facility. This information is not intended as a commitment or contract for billing purposes.
Re-order Total Site Load (kW) Total DG Output Weight Operations
System Size
kW Output
more items
Mode of Operation
(check all that apply)
Give a general description of the proposed installation, including when you plan to operate the DG facility.
agreeing to the terms of service varifies that you have read and fully understand the requirements, procedures and specifications provided in the Heart of Texas Electric Distributed Generation Policy.
Sign above